Project description

This project involved the installation of a duct bank along the south edge of Seventh Street, along the west edge of Union Street, and through the west side of the parking lot east of Eigenmann Hall. A steel sleeve under the railroad was installed for routing conduits. Twenty four-inch ducts were installed in the duct bank.