Wright Quadrangle Renovation

Campus
IU Bloomington
Completion date
July 2024
Project type
Major Student Residence Project
Primary use
Student Residence
Architect
Schmidt
Team leader
Lin

Project budget

Internal budget
$51,900,000
Total budget
$51,900,000

Project description

This project will upgrade building systems throughout the complex, including installation of a central air conditioning system with digital controls, connectivity to the campus chilled water and steam loops, new domestic water and heating water systems, fire alarm and sprinkler systems, electrical systems, LED lighting, security/access systems, data and telecom systems, and a new emergency generator. Selected kitchen equipment will be upgraded and external masonry will be cleaned and repointed. Accessibility improvements will include a new accessible entrance to the complex and a new elevator located at the existing north breezeway. The residential wings will receive new flooring in student rooms and corridors, new ceilings, two new staff apartments, restroom upgrades, and accessible and all-gender restrooms will be added. Windows also will be replaced in the residential wings. The project is planned in two construction phases, with the first phase completing in the 2022-23 academic year and the second phase completing in 2023-24, enabling approximately half of the facility to be in use during each phase. Work in the dining facility will be scheduled to minimize disruption of food service as much as is feasible.

Wright Quad